E Sameh Ibrahim Profile
Profile
Nationality: Egyptian
Mobile: 00965-66259917 E-mail: freeeng21cen@gmail.com
Free Engineers Company General Manager: https://free-engineers-company.blogspot.com/
Recorded Lectures: You tube: “E Sameh Ibrahim
Channel”
Objectives
We Provide E.Cns/ Sameh Ibrahim services as
1.
CEO/General
Manager
2.
Lead
Contract Administrator
3.
Lead
Construction Conflict (Claims-Disputes) Administrator
4.
Lead
Planning & PCS Administrator
With wide Knowledge
and experiences through large number of projects
3.
EMPLOYMENT HISTORY |
||||
POSITION
|
EMPLOYER/COUNTRY |
RESPONSIBILITIES
(BRIEF) |
DATE |
|
FROM |
TO |
|||
- CEO |
1. Free Engineers Company for project management + 2. Project Management institute (PAI) In Kuwait |
Manage
and supervise project control system for more than 150 projects in Kuwait, 250
Projects Different services |
1-Oct-04 |
Till Now |
Projects
manager |
Dream
Land – Egypt |
Dream
Land Project 56
High Buildings, 10 Villas Landscape |
1-Jun-00 |
31-Jan-03 |
Technical
office manager |
Sam
Crete Egypt |
Pyramids
heights Project 20
Big Buildings, 400 Villas, Landscape |
1-Aug-98 |
31-May-00 |
Owner Representative |
Youth
Hostels Association – Egypt |
Manager & Preparing of all tenders ,
specifications , Contract documents and estimation cost for all projects, All Projects plans Supervision
of construction of 6 Youth Hostels |
1-Aug-97 |
31-Jul-98 |
Site
Engineer / Executive manager |
Egyptian
Akkaria Company (Egyptian Public Sector) |
Reclamation
of 12,000 feddan in Sedmant El Jabal (Bani Sweef in Upper Egypt) Construction
of 2400 Residential, Administration,
Governmental Buildings Construction
of 160 Km Channels Construction
of 160 KM Drains Construction
of 160 KM Roads + All Services |
1-Aug-92 |
31-Jul-97 |
In
General |
|
Deliver
many construction Conflict solutions consultation |
|
|
Qualifications
Summary:
·
Civil
Engineering BC. From Mansura University
1992
·
Worked as Projects Manager through
most of his career Period in both Egypt and Kuwait
·
General manager and Owner of Free Engineers Group For project management
·
General manager and Owner of Project Management institute
·
Member in SAVE international Membership Nr. 50065
·
Associated
Value Specialist AVS Engineer
·
Member and Approved International Counselor in Geneva Center for International Arbitration – member Nr. 10948
·
Member and Approved
International Counselor in International Arbitration Chamber of Egyptian Bar Association – member Nr. 002485
·
Member and Approved
International Counselor in European University – member Nr. 7325
·
Member In Kuwait Mediation and Arbitration Chamber
Membership Nr. 31
·
An Instructor for Projects Management , Contractual Affairs, Arbitration
and Value Engineering , Civil Engineering , planning
For More information find full CV in This
link https://drive.google.com/file/d/141Eg5AjNmdi1Ev_hwHlPhtj-hb1Mgfmc/view?usp=sharing
|
·
Work
Experiences as Company General Manager
o Project Management ( 6 Projects) Experience
o Planning ( 120 Projects)
o Claims ( 60 Projects)
o Arbitration ( 10 Cases)
o Court Expert Engineers ( 30 Cases)
o BIM ( 4 Projects)
o Shop Drawing ( 50 Projects)
o Value Engineering ( 4 Work Shops)
o Project Management Institute ( 350
Training Programs)
Certifications
Introduction:
·
Counselor
Engineer Sameh has large experiences in the construction conflict solution
field
·
Execute &
manage and Supervise more than 100 Projects – different Positions &
Different Countries
·
large
experiences in different kind of Projects during his work period
·
Specialized
in project contracts and dispute management
·
Specialized
in Value engineering
·
International
Arbitration counselor
·
Membership
in many international Arbitration Chambers
·
Via
his performance as Group general Manager
he is very keen to apply Value Engineering in all work plans
·
An
extended experience in teaching and training many courses about Construction
conflict solutions, project management, contractual affaires, arbitration,
value engineering, and other project affairs
·
An
instructor for many lectures in most of Kuwaiti Ministries & privet sector
institutes and construction companies in Gulf area and Turkey
Certifications
·
Planning -Certified from American university Cairo
·
AVS Certificate from SAVE international
·
Certified
from KMIAC for Introduction to theory of contract
·
Certified
from KMIAC for Provisions of construction contract
·
Certified
from KMIAC for Claims in construction contracts
·
Certified
from KMIAC for Disputes settlement procedures in accordance with FIDIC
·
Certified
from KMIAC for Evidence in the field of Arbitration
·
Certified
from KMIAC for Legal provisions of the Arbitration agreement
·
Certified from KMIAC & MOJ Kuwait ministry of justice for Judicial Arbitration
·
Certified from KMIAC & Kuwait
ministry of justice for Arbitration
in Kuwait procedures Act
·
Certified from European University as :
International advisors in the field
of investment disputes in the fields of (Contracts for banks, Intellectual
property, Arbitration Engineering and Petroleum contracts … from European
University – 2014
·
Certified from Egyptian Bar Association EBA for Electronic crimes and information security
crimes
·
Certified from Geneva for international Arbitration
for Electronic crimes and information
security
·
Certified from Egyptian Bar Association as Arbitration
counselor
·
Geneva for international Arbitration as Arbitration
counselor –2014
·
Certified from Euro-Arab Trade Organization – 2014 as an
International Advisors At investment disputes, banks contracts, intellectual
property, Petroleum contracts, Engineering arbitration and FIDIC contracts
·
Certified from Auto Desk in Arc Revit program.
·
Certified from Auto Desk in Navis Works
·
An Instructor for Many courses (Projects Management, Construction
conflicts, Contracts,
Arbitration, Court Expert Engineers, Project Planning, Value Engineering
Approvals & Registrations
Ser. |
Firm |
|
1 |
Kuwait
Consultant House – Kuwait |
|
2 |
MOE-
Ministry Of Education – Kuwait |
|
3 |
MOF-
Ministry of Finance – Kuwait |
|
4 |
MOC-
Ministry of Communication – Kuwait |
|
5 |
PAAET-The
Public Authority for Applied Education and Training – Kuwait |
|
6 |
PAI-
Public Authority for Industry – Kuwait |
|
7 |
KUCCS-
Union of Consumer Cooperative Societies – Kuwait |
|
8 |
KIA-
Kuwait Investment Authority – Kuwait |
|
9 |
KFAED-
Kuwait Fund for Arab Economic Development – Kuwait |
|
10 |
KNPC-
Kuwait National Petroleum Company – Kuwait |
Work and Principles
·
Construction Conflict
solutions:
o
Have a cumulative experience in this field by working in more
than 40 cases as experts and 60 claim performance
o
Know that Each 1 KD of the cost of claim guarding service meet
100 KD of claim guarding service cost or 50 KD of add value cost
o
As
earlier the project add this service as add value benefits, vice versa
o
Save
a very huge cost values that represent the hidden risk of random claim
performance due to not assigning the expert team to perform this dangerous
service, by Proper methodologies
o
Save
a very huge cost values that represent the main defense against the costly
actions due owner and consultant daily supervision procedures
o
Increase
the supervision tolerance to avoid claim guarding which also save time and cost
o
Keep
our client rights with taking all necessary amicable precautions to guard our
client rights
o
Treating
both owner and consultant contractual violations
o
Keep/Claim
all rights in its very suitable time and in advance if any, Decrease the costly
performance of both consultant/owner
o
When they find a strong - in time - defense,
once they detect that their actions, reactions are
o
Observed,
monitored by an expert claim team, immediately they keep a step back before
they violate any contractual or cost obligations toward our client
o
This
sort of (right’s guarding) service entitle our clients to gain a huge hidden
benefits which represent a valuable value to their direct cost
o
We
work under a strict rule: We understand carefully that the rights are equal to/
or may be higher than the investment chances
o
Meanwhile,
we know that the rights need a high elasticity, to keep our project smoothly
going on to its targets
o
This
kind of claim guarding services needs a wide knowledge and experiments and an
expert team, this team also must work under a strong systems & rules and
QA-QC from our head office
o
We
do not hesitate to support our team by all successes requirements
o
large experiences to succeed in this
service
Claim Guarding “Rights Guarding”:
o Obligation Matrix is our main
item in claim guarding studies
o
Our
system in project data collection, help us to monitor all project documents
o Carefully follow up and
monitor the project documents flow ( in details) , this system for projects
central follow up in our head office, does not allow for any leak of your
company rights with the other parties ever
o
During
all project period, we work to Draw attention to any document, which may cause any loss of our clients rights
o
We
share in solving such cases in advance; furthermore, we collect all claims
files during the project period,
o
Then
submit each case in its suitable time, supported by strong proves, documents
and technical schedule impact
o
take
a tour in our Planning system to see how is our reporting system is a claim
guarding power
·
Court Expert & Claim
Team:
o
has a main office staff who control all our
projects crews to assure the maximum high performance and also to cover all
kinds of claims
o
Our
main office Supervise and support - if any - our sites teams to deliver the
proper actions/reaction in the very suitable time
o
main office team contain Engineers, contract
administrators, lawyers who are keen to submit
the highest performance and recover all the claim cases from all sides
o
priorities is to use the most amicable and
smooth ways to keep the work going with minimum conflicts
o
Our
team is qualified technically, contractually, and have a wide Knowledge of Law
and contracts and cumulative experiments.
o
Our
Team main principles are: taking the precaution actions are prior than
successor or late claim process to keep business chances, times, costs and
rights of our clients
·
Variety of conflicts
experiences:
o
have a high awareness of contract conditions
& law statements & our experiments in court cases and a related number
high court sentences, all of this knowledge give us an understanding to all
claim cases in its very earlier stage, this understanding enable us to treat
the cases in its very suitable time
o
Understanding
for obligations as per law and contract and able to differentiate between them
o
Experience
with elastic negotiation skills, with wide knowledge of balanced solutions
o
Our
project's claim Teams are homogeneous
o
Our
Claim Team has the awareness of the local construction environment and culture
·
Claim Guarding Service In
General :
o
have a strict system in project data
collection enable us easily to monitor
the rights guarding
o
carefully follow up and monitor the project
documents flow ( in details) ,this Exclusive system for data monitoring enable
us to control and audit all our project’s teams from our head office,
o
we have a main office QA & QC system which
firmly monitor our teams to avoid any leak of our client’s rights with any other
parties
o
During
all project period, we work to Draw our client
attention to any violation may lead to any losses for rights
o
is keen to solve any claim case in advance,
furthermore, we collect all claims files during the project period very
smoothly without any conflict
o
Used to submit each case in its very suitable
time, supported by a strong proves, documents and technical schedule impact
o
Main office is keen attend the important claims meetings, with
strong and high elastic negotiable
capabilities, as we used in all of our
projects
o
build the claim files with all required
documents to prove our cases
o
We
understand carefully that, the Claim service doesn’t only mean guarding of
time, cost and rights guarding, but also targeting the best commercial
explanation to the contract's document priorities to issue the best choice of
add values and obtaining the best alternative chances to add the optimum
benefits to our client
o
The
Local firm performance in claim is stronger than the foreigner firm, because
the local firm is aware of the local construction environment , local
construction cultures , laws and procedures cost
o
As
earlier the project add this service as add value benefits, vice versa
·
Scope of Claim guarding
services:
o
Design
the project document circulation & forms and responsibility matrix to
determine the contractual obligations for each party
o
Cover
all claim affairs with all other parties
o
Performing
the necessary actions to cover our client rights toward the others
o
Monitoring
and guarding (in time) the contractual performance of all other parties
o
Protect
our client rights against any contractual violations in time and in advance
o
have a high loyalty to our client
o
Submit a monthly report for our claim services
to our client, contain the main items of claim guarding service and discuss the
strategies, chances of claim services, and give the area of claim concerns
along all the project period
·
Construction Conflict Solutions Methodologies
1.1Summary
of our work Methodologies
1.1.1
Claim Review and Preparation
Stage
1.1.1.1 Data
collection, Contractual and legal Referrals
1.1.1.1.1
Review
for Existing Project Status
1.1.1.1.2
Document Sorting
1.1.1.1.3
Grouping
documents and data
1.1.1.1.4
Claim
documents data analysis
1.1.1.1.5
Matching
Cases with contract conditions
1.1.1.1.6
Matching
Cases with contract document priorities
1.1.1.1.7
Matching
Cases with Civil law statements
1.1.1.1.8
Assign
the contractual bases
1.1.1.1.9
Assign
The Law Bases
1.1.1.1.10 Contractual Referrals &
Violations
1.1.1.1.11 Responsibility Matrix
Violations
1.1.1.1.12 Legal Obligation Violations
1.1.1.1.13 The contractual and Law bases
report that contain a detailed study for each used contractual and civil law
references
1.1.1.2 Claim
Procedures and rights Calculations
1.1.1.2.1
Upgrade
claims
1.1.1.2.2
Time
impact
1.1.1.2.3
Cost
impact
1.1.1.2.4
Final
Claim results
1.1.1.2.5
Claim
report and tables
1.1.1.2.6
Claim
submittal
1.1.1.2.7
Claim Negotiations
1.1.1.2.8
Covering
Claim meetings or client replies or client explanations requirements
1.1.1.2.9
Claim
Upgrade or modify if any
· By reaching to this step, we
have the following achievements:
a. A Complete and clear
understanding to the contract conditions related to our claim cases
b. Classifications of claim
cases under the each contract and civil law condition
c. The most optimum Method of
calculating the deserved rights supported by contractual and law clear
understanding
d. The most proper approach to
have an amicable solutions” if the client party legal department do a fair
study the deliverable # 2.1.1.1
1.1.2.1 Filing
the case رفع الدعوي
1.1.2.1.1
Documents Translation To Arabic
1.1.2.1.1.1 Filing a case require to
translate all the case document into Arabic as Kuwaiti law rules
1.1.2.1.1.2 All Translated Documents must be signed and stamped by endorsed
translation firm
1.1.2.1.1.3 We used in our company to
translate all required document by a professional translators in our office and
get signature and stamp from the translation firm
1.1.2.1.1.4 The translation is an
important and basic process in all case procedures
1.1.2.1.1.5 We Do not Know the volume of
document that may need translation, But we shall assign the resources to
perform the professional translation in not less than a month before the
statement of claim
1.1.2.2 The
Court of First Instance: FIC.
1.1.2.2.1
Statement of Claim عريضة الدعوي
1.1.2.2.1.1 We prepare the statement of
claim with the legal consultant
1.1.2.2.1.2 It is main principle in our
work that the most important item In the statement of Claim is the wording of
demands
1.1.2.2.1.3 We understand that the
Demands wording must be subjected to an accurate study by all team specifically
the legal consultant, because the wording here is very critical and may send
the case to fail or win alike
1.1.2.2.1.4 The Demands are ruled by the
code of procedures,
1.1.2.2.1.5 The case take date and time
(named “ the table” for the Court of First Instance
1.1.2.2.1.6 The Acknowledgement
procedures take place by the court Acknowledgement department through about
30:45 Days
1.1.2.2.1.7 The Court of First Instance
hold from 2 : 4 times in a 2:4 months
1.1.2.2.2
Preliminary ruling حكم الإحالة
1.1.2.2.2.1 Transfer the case to Expert
Department (Refer to expert dept.)
1.1.2.2.2.2 We understand very clearly
the Expert rules in practical and actual cases
1.1.2.2.2.3 We understand very clearly
that the preliminary ruling is an order from the judge to the experts to study
the conflict between the claimant VS respondent, in the limit of judge statements
1.1.2.2.2.4 Accordingly we do not allow
by all means to both Expert and respondent to take us out of judge order to
control the case time, this is very important rule in our work
1.1.2.2.2.5 We Understand that the Expert
has now right to explain the law as the law explanation is an exclusively for
the judge, this also is very important rule
1.1.2.2.2.6 Preliminary ruling issued
from the esteemed first Instance with a nominated period and date for the next
holding ( usually from 6: 8 months)
1.1.2.2.2.7 This period is given to the
expert to put his report for preliminary ruling
1.1.2.2.2.8 The expert to submit his
report through the nominated period
1.1.2.2.2.9 If the experts meeting do not
finish through the PR. Period, he may ask to delay the report, accordingly the
FIC decide to delay to forecast date, while the expert continue to manage the
meeting until covering all cases from both
1.1.2.2.3.1 The “Refer to expert dept.”
take from 2:3 Months
1.1.2.2.3.2 The Expert department
Acknowledge the opponents
1.1.2.2.3.3 We already have started to
prepare our Pleading brief very earlier immediately after translation, by our
experience and expectation of the PR. statement
1.1.2.2.3.4 We submit our first Pleading
brief to the expert
1.1.2.2.3.5 This Brief contains all our
demands statements ,claims, calculations, legal referrals, contractual
referrals supported by all evident as per our large experiences for what must
be written to the experts
1.1.2.2.3.6 The Expert Meetings continue
through the PR. Nominated period or more, depending on the volume of documents
submitted by both claimant and respondent
1.1.2.2.3.7 The Expert issue his report
1.1.2.2.3.8 We study the report, if it
meet our demand, we agree for the report by written brief to the esteemed FIC.
1.1.2.2.3.9 If the expert report do not
meet our demand we, prepare a brief to the FIC to submit to FIC. To explain our
objections for the expert report depending on:
1.1.2.2.3.9.1
Procedures
Objection
1.1.2.2.3.9.2
Subjective
Objections
1.1.2.2.3.9.3
Legal
Objections
1.1.2.2.3.10 Again The FIC hold for 2: 4
seats in about 2:3 months
1.1.2.2.3.11 The FIC may issue the its
decision in the case ( very rarely)
1.1.2.2.3.12 Alternatively, in majority
cases The FIC decide to return the case to the expert to restudy, same as the
PR. With a nominated period and date
1.1.2.2.3.13 This takes about 6 : 8 Months
1.1.2.2.3.14 The Expert held the second
expert period in the same procedure as the first expert period
1.1.2.2.3.15 After issuing the second
expert report the same procedures are repeated
1.1.2.2.3.16 Back to FIC to issue the
first degree decision
1.1.2.2.3.17 The FIC decision has the
first degree Binding force
1.1.2.2.3.18 If The FIC decision meet our
demands, we agree
1.1.2.2.3.19 If The FIC decision meet our
demands, we prepare and submit our objection to the FIC decision
1.1.2.2.3.20 If no one object the FIC
decision turned to final degree Binding force
1.1.2.3 The
Court of Appeal ( Court of Second degree) COA محكمة الاستئناف
The same Procedure of the FIC Stage
·
Preliminary
ruling حكم الإحالة
·
Experts
Procedure
-
The
FIC decision has the final degree Binding force
-
The
claimant may demand execute the judge sentence unless the respondent do not
demand to hold until the final supreme court decision
1.1.2.4 The
Supreme Court محكمة التمييز SC.
-
The SC. is the final stage
-
Usually
the SC. hold to judge the other two degrees procedures
-
But
The SC. May Decide to proceed judging on the case subject
-
SC.
May Transfer to the expert again once or twice
-
Then
issue the final decision
-
The
SC. decision has the force of higher
degree Binding force
According to this very simple summary
Specialized in amicable Claims, Court disputes and Arbitration
cases, and both claim amicable procedures and court procedures
Have an actual & Realistic and wide experience to
perform all kinds of construction conflicts and court disputes
Have a very high understanding to use the contract clauses
that shall enable us to classify all kinds of construction variations
Understanding to all cases is based on the high court sentences
that give the right directions to all conflicts strategies
Experiences and our Understanding of the service
From our work cases and real field
experiment, we have a very clear understanding for Example but not exclusive:
o
Interpretation
of contracts, Local Laws and regulations
o
Claim
Strategy, Preparation and negotiation
o
Contracts
documents priorities, from where we can get our client rights
o
Contract
and Law Obligations and how to classify and determine the right obligation
&
o
kinds
of obligations
o
The
power of construction forms and documents as a prove tools
o
Civil
and Commercial Procedures Law
o
Disputes
procedures through the First Instance up to the Supreme Court
o
Expert
rules, regulations, meeting and prove tools and evidences
o
Wording
of the demands as the most important item in the disputes
o
What
must be written to the expert and what must be written to the judge in all
stages of disputes
o
Control
the time of conflict in the court and how to not allow to the opponent to
enlarge the time of dispute
o
We
continuously Read and study the other cases final judgment sentences of high
court to use in our cases writing to strength our cases
·
Project Management Experiences
·
Design Phase Management
·
Project requirements
o Coordinate with the client to
determine the project criteria and requirements according to the client aims
and targets, to get the optima benefits of the studied area, to assure a
the project extreme investment rebound
·
Assigning a consultant
o Managing a design tender to
cover the project requirement, and driving an evaluation process to assign the suitable
consultant, who performs the project design and licenses for construction.
·
Design management
o Managing the design process
to assure the design quality, construction documents, and project
specifications and guarding the cost affairs, to maximize benefits mean while
minimizing expenses.
·
Design follow up and
approval
o Review and follow up the
design process to reach the optimum compliant with the ideal standards,
economic materials and methods of construction.
·
Design control
o Reach with the design to serve
the Master scope of the project by:
§ Budget & Cost Reports
§ Mile stones schedule Reports
§ Work program schedule Reports
§ Project status reports
§ Project financial monitor and
report current financial data for each agreement on the project.
·
Value Engineering (VE)
o The Effective VE will be to
design and construct facilities that best meet the program requirement at the
lowest service life cost. (see Value
chapter)
·
Administration
o have set up a strict administration procedures
for the project management, for both consultant, contractor and owner
·
Design Management staff
o assign (for each suitable stage) the
professional staff of wide range of Experience to carry out the Total Program
Management Services
· Tender Procedures
o Perform the tender procedures with the client,
to have the best construction services and quality with the minimum cost.
·
Construction Phase
Management
·
Management Concept
o The main aim of construction
management is to take the project to finish in time, with planned, advanced
budget and high quality, avoiding claims of cost and time, so the client
rebound his invested budget and apply his goals. Using a high professional
system of management
·
Time Management
o Create Master program
schedule for the project before construction start up.
o Prepare the project control
format.
o Update schedule each a
suitable interval for project follow up
o Reporting for time status and
spot the delayed activities if any
·
Cost Management
o Review and check the
estimated cost established by the consultant for the recent project.
o Value engineering services to
minimize cost with best construction solutions and methods and used materials.
o Controlling costs during the
construction phase, guarding the cost centers created with the master plan, and
using the cost codes and reports.
·
Quality Management
o Using our construction
control format to control the construction quality by submittals, and
inspection format to assure the work comply with the contract documents and
specifications.
·
Claim guarding During the
projects
o Before construction, we
assist the Client to select the most appropriate contract strategy for
accomplishing the work. Once
construction is underway, we will assign the administration that defuses claim
issues. (See Claim Methodology chapter)
·
Document control and status
reporting
o Using a complete documentation for historical
purpose, and provide tracking system for quick document retrieval. Our reports tailored to each project’s needs
include monthly progress report to keep the Client informed about project
progress
·
Construction Management
staff
o assign (for each suitable stage) the
professional staff of wide range of
o Experience to carry out the
Total Program Management Services
Planning Experiences:
·
Planning
is consider as an important contractual document for future claims,
arbitrations & disputes.
·
The
professional & logic schedule can protect
your company against any un- fair performance by the consultant party
during work progress
·
The expert & dynamic planning services
will surly save your cost by getting the maximum benefits of using your
available resources and accurate follow ups.
·
The
rapid approval of the master CPM schedule is the best benefit for you to confirm the project baseline at
the early stages of the project
·
The
long term project success based on the
accurate and full site progress data collection, then the analysis of
this data, and the experience of using (what if scenario techniques )
·
Prepare
or modify the project CPM target master schedule as per contract requirements
·
Determine
and Customize the project locations, Zones and levels to estimate the optimum
time and resources integration, to achieve the ideal solutions for work plan,
and resources movement during project period
·
Considering
all related authorities procedures, through all contract phases
·
Design
quality control plan that comply with contract specifications
·
Prepare
quality assurance plan as per contract statements
·
Obtain
safety plan as per contract requirements
·
Adjust
the schedule as per our client suitable circumstances, and expected local
construction environment risks, to gain and maximize benefits, versa, to
minimize risks for our Client.
·
Monthly Progress updates
& weekly follow-up efforts :
·
Monthly
CPM update reports
·
Two
weeks ahead Schedule
·
Triggers
for the delayed activities
·
Triggers
for the delayed drawing submittals
·
Triggers
for pending drawing Approvals
·
Triggers
for the delayed Material submittals
·
Triggers
for pending Material Approvals
·
Attention
for the delayed Material procurement (order-manufacture-shipping-customer
service release-arrival to site)
·
Control
site format performance in detail
·
Technical Support
Department:
·
Design
Review & Shop drawings & composite services drawings
·
Starting
with site coordinates, and comparing with the design drawings
·
Check
& colligate the project axis for all drawings
·
Determining
all the conflicts at an early stage of the project
·
Perform
high quality shop drawing details as a manual of work executing as well as the
high quality & approved shop drawings
·
Express
and applicable composite drawings to avoid rework and costly problem solutions
·
Prepare
the drawing submittal list schedule
·
Study
the drawings in conjunction with all contract documents
·
Prepare
RFI’s (request for information) giving enough time before submittals to save
time and
·
efforts,
depending on the contract documents priorities
·
Perform
the shop drawing as per the above introduction statements
·
Submit
of the shop drawing to the consultant
·
Follow
up the submittals with consultant to get approvals
·
Attend
all technical meetings concerning shop drawing or RFI’s
·
Attend
Site Progress Meetings
·
Applying highly professional Utility systems for
composite services drawing coordination and
·
production
·
Prepare
the Final as-built drawings
Planning Scope of work
·
Target CPM schedule
o Prepare or modify the project
CPM target master schedule as per contract requirements
o Determine and Customize the
project locations, Zones and levels to estimate the optimum time and recourses
integration, to achieve the ideal solutions for work plan, and resources
movement during project period
o Considering all related
authorities procedures, through all contract phases
o Design quality control plan
that comply with contract specifications
o Prepare quality assurance
plan as per contract statements
o Obtain safety plan as per
contract requirements
o Adjust the schedule as per
our client suitable circumstances, and expected local construction environment
risks, to gain and maximize benefits ,versa, to minimize risks for our client
·
Monthly Progress updates
& weekly follow up efforts
o Monthly CPM update reports
o Two weeks ahead Schedule
o Attention for the delayed
activities
o Attention for the delayed
drawing submittals
o Attention for pending drawing
Approvals
o Attention for the delayed
Material submittals
o Attention for pending
Material Approvals
o Attention for the delayed
Material procurement (order-manufacture-shipping-customer service
release-arrival to site)
o Control site format
performance in details
Project Control System
o Project Description
o Project Summary , works
summary
o Interim Certificates summary
o The Employer organization ,
<to be updated with any changes>
o Main Contractor organization
< Updated with any changes>
o Supervision Consultant organization
<to be updated with any changes>
o Approved Sub-Contractor
<to be updated with any changes
·
Progress Control
o Summary of Progress Status
o Problems, Corrective Actions
& Effects on Completion
o Meetings During the Month
o Transmittal Status
o Monthly Submittal Log
o Monthly Procurement Log
o Contractor’s Manpower Log
o Contractor’s Equipment’s
& Machinery Log
o Progress photographs with
works description
·
Time Control
o Time summary
o Recovering the program for
contractual finish date
o Time Elapsed (tabular and
chart data )
o Completion status (tabular
and chart data )
·
Cost Control
o Cost Summary (tabular and
chart data )
o Payment Status (tabular and
chart data )
o Variation Order Status
(tabular and chart data )
·
Project Value Analysis
Report (Monthly) (PVA)
o Rates of work done elapsed/month
o Rates of work done
remaining/month
To Estimate The Project Value Progress
And Make The Necessary Actions To Correct Project Flow Problems If Any
·
Quality Control Report
o Safety Control status (SCS)
o Contractor’s Manpower Log
(CML)
o Contractor’s Equipment’s
& Machinery Log (CEL)
o Check List Log (CLL)
o Request For Information (RFI)
o Material Delivered to Site
(MDS)
o Job Site Instruction (JSI)
o Site Work Instruction (SWI)
o Non Conformance Report (NCR)
·
Safety Violation Guarding
o
have a qualified staff to perform Safety
control through all the project stages
·
Top Management Reports
A-
TOP MANAGEMENT REPORT (BY WEEKLY) (TMR)
1-
ADMINISTRATION REPORT
1.1
Project
Data
1.2
Time Status
1.3
Cost Status
1.4
Time
elapsed
1.5
Tabular
cash flow
1.6
S
curve
2-
TIME REPORT
2.1
Periods
& Dates
2.2
Delayed
Items
2.3
Delay
Solutions
2.4
Area Of
Concern
3-
QUALITY CONTROL REPORT
3.1
Check List
Status
3.2
Shop Dwg.
Status
3.3
Material
Status
3.4
RFI Status
3.5
Corresponding
Status
3.6
Transmittal
status (Materials & Shop dwg.
4-
PROGRESS STATUS
5-
MAIN PROJECT PATH STATUS
B-
SIMULTANEOUS WEB SITE AIDS
Used to
create a simple web Blogger site for project progress, to update our client
board by a simultaneous summarized view for project progress
Claim
guarding with planning service
·
Our
system in project data collection, help us to monitor all project documents
·
we
carefully follow up and monitor the project documents flow ( in details) , this
new system for projects central follow up in our head office, do not ever allow
for any leak of your company rights with the other parties
·
During
all project period, we work to Draw attention to any document, may cause any
loss of our clients rights
·
We
share in solving such cases in advance; furthermore, we collect all claims
files during the project period,
Then submit each case in its
suitable time, supported by a strong proves, documents and technical schedule
impact
Furthermore, we Perform the claims service amicably, with strong negotiable prove, as we used in all project
Value Engineering Experiences.
Value Services:-
-
Establish
Value Engineering Departments (Ministries/Authorities/Companies)
-
Value
engineering for organization's Departments (raise-up performance benefits)
-
Value
Engineering consultancy (Investment Ideas/Concept & Design/Construction)
-
Value
Engineering Workshop's & report's
-
Value
Engineering Training course & Certifications
Establish
for Value Engineering Departments (Ministries/Authorities/Companies):
-
have a cooperation agreement with
international KIRK associates for Value Engineering, in the field of VE service
and VE training
-
Where the
Value Engineering as a new trend of construction projects has not yet wide use
in the medal east, -Expect KSA Which has been applied And established a special
departments for VE in Ministry of defense over 10 years ago -, and as well as
our Bureau has a large specialized team in Kuwait for implementation of Value
engineering applications
-
These
services are assigned to
(ministries/Authorities/companies) to establish their own team for future and
regular application of value engineering for their projects
Value Engineering
Services:
1- Visibility studies for the benefits of
establish the VE department
2- Creation of the department scope description
and the administration communication channels with other departments
3- Creation of the strategic plan and future
expended for the department
4- The proper organization, the number and
the required requirements for the department team
5- Training courses and qualifying the candidates department's staff
6- Implementation of VE methodology at the
initial phase of the establish the departments
with the participation of department's staff, as a practical training
applications
·
Value engineering
for organization's Departments (raise-up
performance benefits)
7- One of the great application of VE, that
it can help the organization's board to audit and enhance their Department's
performance,
8- Contribute to improving an organization’s
competitive position.
§ Enhancing
Organizations Value Engineering service
9- Check and enhance organization strategic
plan
10- Apply VE methodology for organization's
charts
11- Apply VE methodology for organization's
department
12- Apply VE methodology for organization's
formats and communications channels
13- Generate ideas for enhancing work
performance
14- Implementation of approved VE ideas
15- Audit work performance and issued follow
up reports
Experiences
in Construction Conflict Solutions:
o
Number
of years of experience in Kuwait as an experts in Planning & Claims
§
Disputes
and Construction Conflict solutions = More than 15 Years
o Industry Sectors served as a
Claim Specialist
§
Privet
Entities VS Governmental Sector
§
Privet
Entities VS Privet Entities
o Customers served as a Claim
Specialist
§
National
Industries Co. VS Public Authority For Housing Welfare (Claims & Disputes)
§
Al
Fleej Co. VS Kuwait National Guard (Claims & Disputes)
§
The
Energy and Resources Institute TERI VS
Kuwait Oil Company (Claims)
§
Abdul
Hamid Al Issa Co. VS Ministry of Public Works (Claims & Disputes)
§
Abdul
Hamid Al Issa Co. VS Wataniya Airways (Claims & Disputes)
§
Abdul
Hamid Al Issa Co. VS Public Authority Of Agriculture Affairs And Fish Resources
§
(Claims
)
§
26
February Co. VS Kuwait University (Claims & 3 Disputes)
§
26
February Co. VS Kuwait Oil Company & Gulf Company (Claims & Disputes %
Judicial
§
Arbitration
)
§
Burgan
Co. VS Ministry of public works (Claims & Disputes)
§
Burgan
Co. VS Al Katamy Co. (Disputes)
§
26
February & Amana Co. VS Public
Authority Of Agriculture Affairs And Fish Resources
§
(Disputes)
§
Al
Shahin Consultant Bureau VS Touristic Enterprises Company (Disputes)
§
Specialist
Co. VS Ministry of Public Works (Claims & Disputes & Judicial
Arbitration )
§
Green
Line Co. VS Ministry of Public Works (Claims)
§
Al
Dalil Co. VS Al Mulla & Bahbehani (Claims)
§
Al
Safti Co. VS AL Maskar Co. (Claims)
§
Khalid
Ali Al Kharafi Co. VS Ministry of Public Works (Claims)
§
Al
Dewan Co. VS Ministry of Health (Claims)
§
Al
Omara Co. VS Ministry of Public Works (Claims)
§
Al
Omara Co. VS Al Surra Cooperative (Claims)
§
Al
Argan Co. VS Ministry Of Electricity And Water (Claims)
§
Al
Argan Co. VS Al Sayer Co. (Claims)
§
Al
Argan Co. VS Public Authority for Minors Affairs (Claims)
§
Al
Fooz Co. VS Ministry of Public Works (Claims)
§
Al
Sanea Co. VS Ministry of Health (Claims)
§
Badr
Al Mulla Co. VS Ministry of Public Works (Claims)
§
Badr
Al Mulla Co. VS Environment Public Authority (Claims & Disputes)
§
Kuwait
Building House Co. VS Ministry of Public Works (Claims)
§
8
Arbitration cases as Arbitrators with privet sector clients
50 succesfull Project Claim service
30 Disputes as expert Engineer
E. Sameh Ibrahim Projects Experiences
41 |
Al-Mangaf Neighborhood Center (Horizontal project), Kuwait |
|
|||
Description: |
The construction of Al-Mangaf neighborhood center - located in
Mangaf district with approximately site layout area 41,000 m2 consists:- SM-super market(3levels/3600m2) / RS-retail
shops(1level/2600m2) / GO-government
offices(2levels/2400m2) / PS- police station(2level/2000m2) /
PG-parking garage (4level/5600m2) /
EX- external works |
|
|||
Project: |
KD 6,919,000,000 |
||||
Owner: |
MPW, Ministry of Public |
Contact: |
E. Wafa Mallah |
||
Consultant: |
MPW, Ministry of Public |
Contact: |
E. Fawazia Al-lafy |
||
Contractor: |
Burgan Contracting Co. |
Contact: |
E. Emad Abo Tahon |
||
Start Date: |
15 – Jan -2009 |
Finish: |
In progress - financial |
||
Duties: |
target CPM, progress reports & follow up, site meetings,
resources Control (shutter& crew
movement), claim guarding |
||||
Claims: |
VO for modifying contractual items & canceling the modifications KFD delay of F.F shop drawings approval |
claim 65 d claim 315 d |
App. 35 d App. 135 d |
42 |
Al-Asemah Educational Headquarters’ Building- (High raise),
Kuwait |
|
|||
Description: |
The construction of Educational Offices Headquarters’ Building located at sharq district with approximately site layout area
5500 m2. the main building (2basement+ground+2mizz+14typical levels) and landscape works |
|
|||
Project: |
KD 6,873,000,000 |
||||
Owner: |
MPW, Ministry of Public |
Contact: |
E. Galal Mustafawy |
||
Consultant: |
MPW, Ministry of Public |
Contact: |
|
||
Contractor: |
Burgan Contracting Co. |
Contact: |
E. Abdul fatah muntisr |
||
Start Date: |
13 – Aug - 2008 |
Finish: |
In progress - financial |
||
Duties: |
Target CPM, progress reports & follow up, resources Control (shutter& crew
movement), claim guarding |
||||
Claims: |
Owner Change request for modifying contractual items KFD delay of F.F approval |
claim 183 d claim 286 d |
App. 87 d App. 169 d |
43 |
Al-RAI 3S Facilities (Al-mulla & Bahbehani show room),
Kuwait |
|
|||
Description: |
The design & build for new 3SF main building and renovation
of the existing show room (A) and (B) at al RAI district with Approximately site area 7343 m². |
|
|||
Project: |
KD 2,150,000.000 |
||||
P.M.: |
Projacs |
Contact: |
E. Mohamad Ayiad |
||
Consultant: |
Dar Saoud Al Muhana |
Contact: |
E. Abdul Rahman Soker |
||
Contractor: |
Al-Daleel Contracting Co. |
Contact: |
E. Ossama sad-aldin |
||
Start Date: |
15 – May -2010 |
Finish: |
15 – Nov -2011 |
||
Duties: |
Target CPM, progress reports & follow up, resources Control (shutter& crew
movement), claim guarding |
||||
Claims: |
Owner modification for design concept |
Claim 116d & 256,000 KD |
App. 65 d & 149,000 KD |
||
44 |
New Marine & Facilities for Al-Khiran Resort, Kuwait |
|
|||
Description: |
Al-Khiran resort marine, 4 facilities building (Diwaniea +admin. Building +changing rooms +sub-station) & construction of new marine (650MR) and maintenance for existing marine (1050MR) |
|
|||
Project: |
KD 6,348,000,000 |
||||
Owner: |
Enterprise touristic Co. |
Contact: |
|
||
P.M.: |
Total Management |
Contact: |
E. Mamdouh |
||
Contractor: |
Green line Co. |
Contact: |
E. Cresto Tomazo |
||
Start Date: |
15 – Jan -2010 |
Finish: |
14 – Nov -2012 |
||
Duties: |
Target CPM, progress meeting & reports follow up |
||||
Claims: |
VO for modifying pontoons specifications (to concrete type
pontoons) VO for modifying Electrical cables specifications |
Claim 480 d & 961,000 KD |
App 480 d & 961,000 KD |
45 |
Warehouse Project - 6th October City, Egypt |
|
||
Description: |
a design, permits, construction &maintenance of warehouse project 6th October city, Egypt the building initial estimated area 43,000 m2 , store building
with main space for storing <warehouse> , and an office area,
with all necessary electro mechanical services LANDSCAPE WORKS |
|
||
Project: |
LE 100,000,000.000 |
|||
Owner: |
PWC logistics Egypt |
|||
Consultant: |
PWC logistics Egypt |
|||
Contractor: |
Egyptian combined Contracting Co. |
|||
Start Date: |
12 – Sep – 2007 |
Finish: |
10 – Nov – 2008 |
|
Duties: |
Target CPM, progress reports & follow up |
|||
46 |
Emergency MOH Hospital Expansion Building At M.Alkabeer, Kuwait |
|
||
Description: |
MOH project is a design, construction and maintenance of an
expansion building located in Mubarak Al-Kabeer hospital at al Jabriya
district the building initial estimated area 16500 m2 (basement, ground, 1st,
2nd, 3rd, 4th, gas room, substation) & landscape works), (12 examination clinic+148 bed+8isolation
rooms+3minor surgery rooms) |
|
||
Project value: |
Was KD 3,650,000 upgraded to KD 8,200,000.000 |
|||
Owner: |
Ministry of Health |
Contact: |
|
|
P.M.: |
Projacs |
Contact: |
E. Yasser Abdul Razak |
|
Contractor: |
Al-Sanea Co. |
Contact: |
E. Mahmoud Anwer |
|
Start Date: |
06 – Jan – 2008 |
Finish: |
23 – Feb – 2009 |
|
Duties: |
Target CPM, progress reports & follow up, coordination
meetings Composite services drawings |
47 |
Emergency JH Hospital Expansion Building At Al-Jahraa Hospital,
Kuwait |
|
||
Description: |
JH project is a design, construction and maintenance of an expansion building located in Al-Jahraa hospital at al-Jahraa district the building initial estimated area 8500 m2 (basement, ground, 1st,
2nd, 3rd, gas room, substation) & landscape works (8 examination clinic+105 bed+6isolation rooms+2minor surgery) |
|
||
Project: |
Was KD 3,650,000 upgraded to KD 5,100,000.000 |
|||
Owner: |
Ministry of Health |
Contact: |
|
|
P.M.: |
Projacs |
Contact: |
E. Mohamad Ayiad |
|
Contractor: |
Bayan national Co. |
Contact: |
E. Samar Al-Afyoniy |
|
Start Date: |
06 – Jan – 2008 |
Finish: |
23 – Feb – 2009 |
|
Duties: |
Target CPM, progress reports & follow up |
48 |
Hiya Abdul Rahman Ali Al-Habeeb Center For Digestive System,
Kuwait |
|
||
Description: |
The project is a design, construction and maintenance of a new Building for Digestive system - located in Mubarak Al-kabeer Hospital at Al-Jabriya District |
|
||
Project: |
KD 2,388,079.570 |
|||
Owner: |
Ministry of Populace Health |
Contact: |
|
|
Consultant: |
Kuwait Technical Consulting |
Contact: |
E. Alaa Al-Den Ghalel |
|
Contractor: |
Al-Sanea national Co. |
Contact: |
E. Mmdouh Faghry |
|
Start Date: |
22 – Jan – 2009 |
Finish: |
18 – Jan – 2011 |
|
Duties: |
Target CPM, progress reports & follow up, resources Control (shutter& crew
movement), claim guarding |
49 |
Wataniya Air Ways Head Office Building, Kuwait |
|
|||
Description: |
the construction and maintenance for the new building of
al-Wataniya airways co. at intentional airport area the building initial
estimated area 11500 m2 consists of four levels (basement, ground, first,
second and third floor) |
|
|||
Project: |
KD 2,495,000.000 |
||||
Owner: |
Wataniya Air Ways |
Contact: |
|
||
P.M.: |
KUCM |
Contact: |
E. Hesham Hassan |
||
Contractor: |
Abdul Hamaid Al-Essa |
Contact: |
E. Ahmed Mustafa |
||
Start Date: |
01 – Apr -2009 |
Finish: |
30 – Jun – 2010 |
||
Duties: |
Target CPM, progress meeting & reports follow up, claim guarding |
||||
Claims: |
Delay of project start-up, consultant supervision undertaking Delay of isolated footings, conflict in the contract design
drawings, with high pressure cables under foundations Delay of ground floor slab cast, MEW reservation toward any Construction elements above power cables area Delay of materials delivery, supplied by the owner (SWI
NO.15) that have added marble cutting
to our scope of work Delay of current release procedures at MEW |
claim 166 d & 115,000 KD |
APP: 12,000 KD By Final court sentence |
50 |
Committee of Women’s Affair Building, Kuwait |
|
|||
Description: |
The construction and maintenance of Women affair committee building located in Al-Shaab district- gulf road beside Al-Shaab Palace, the building
initial estimated area 8600 m2 basement, ground, 1st, 2nd, 3rd,) & landscape works |
|
|||
Project: |
KD 2,295,000.000 |
||||
Owner: |
MPW, Ministry Of Public Work |
Contact: |
E. Maged Al-Ansary |
||
Consultant: |
MPW, Ministry Of Public Work |
Contact: |
|
||
Contractor: |
Abdul Hamid Al-Essa |
Contact: |
E. Esam Al-Bana |
||
Start Date: |
06 – Sep -2009 |
Finish: |
26 – Jan – 2011 |
||
Duties: |
Target CPM, progress reports & follow up , claim guarding, |
||||
Claims: |
MPW V.O’s for modifying contractual items (HVAC Equipment’s, Electrical Cables & DB’s) |
claim 345 d |
App. 298 d |
51 |
EPA, Environmental Public Authority Building (marine Labs),
Kuwait |
|
|||
Description: |
The project is a construction and maintenance of environmental public authority department building located in Ras-Elard
area at salmiya, The project consists of Construction of main building (3
floors) = 7228 m² |
|
|||
Project: |
KD 2,647,000.000 |
||||
Owner: |
Environmental Public Authority |
Contact: |
E. Nada Al-Abdul Hadi |
||
Consultant: |
Jassim Qabazard Engineering Consultant |
Contact: |
E. Ahmed Haider |
||
Contractor: |
Bader Al Mulla & Brothers Co. |
Contact: |
E. Ahmed Omran |
||
Start Date: |
13 – Jun -2010 |
Finish: |
13 – Dec – 2011 |
||
Duties: |
Target CPM, progress reports & follow up , claim guarding |
||||
Claims: |
. Delayed implementation of the work (according to site obstructions outside the scope of the contract . Delay receipt of the site border from Kuwait Municipality . Delay due to the nature and circumstances of unexpected location and the very difficult (delayed drilling /consolidation
/ withdrawal of water) .Delay of the request by the owner work tests and tests to mix reclamation
construction . delay as a result of Ministry of Electricity Reservation on
site power plant at Basement |
claim 155 d |
App. 65 d |
52 |
EBS, Egailah secondary School, Kuwait |
|
|||
Description: |
The project is a construction and maintenance of Egailah
secondary School, The project consists of Class rooms, Labs & administration building (3 levels 4500m2
each) Auditorium building (150 seats 1050m2) / multipurpose hall
(2150m2) Mosque (310m2)/Site Facilities (sub-station-mechanical room
500m2) External work (playground-boundaries) |
|
|||
Project: |
KD 4,747,000.000 |
||||
Owner: |
MPW, Ministry Of Public Work |
Contact: |
E. Mashri Al-Mkrad |
||
Consultant: |
MPW, Ministry Of Public Work |
Contact: |
|
||
Contractor: |
Bader Al Mulla & Brothers Co. |
Contact: |
E. Tarek Harb 65167184 |
||
Start Date: |
05 – Aug -2009 |
Finish: |
04 – Aug – 2011 |
||
Duties: |
Target CPM, progress reports & follow up , claim guarding |
||||
Claims: |
. Conflict of site leveling with design drawings . Unsafe of construction design drawings . VO for modifying structure elements |
claim 268 d |
App. 175 d |
53 |
KISR, Petroleum research Center (petroleum Labs), Kuwait |
|
||
Description: |
The project is a construction and maintenance of Petroleum research Center located in KISR Al-Ahmdi, The project consists of:- . Construction of main building (4 floors 3450m2 each) = 7228 m² . Construction of service building= 208.9 m² |
|
||
Project: |
KD 3,647,000.000 |
|||
Owner: |
Kuwait institute for scientific researches |
Contact: |
E. Raa’of |
|
Consultant: |
Al-Zamami Engineering Consultant |
Contact: |
E. Mathiw Lens |
|
Contractor: |
Bader Al Mulla & Brothers Co. |
Contact: |
E. Sanjay |
|
Start Date: |
13 – Jun -2010 |
Finish: |
13 – Dec – 2011 |
|
Duties: |
Target CPM, progress reports & follow up , claim guarding |
54 |
The Main Support, Emergency and Operation Centre, Kuwait |
|
Description: |
The Main Support, Emergency and Operation Centre - have a total site area of about 150,000 sq.m. The Site is located in
Kuwait and South Al Ahmadi |
|
Project: |
KD 15,700,00 (Package –
1) |
|
Project: |
KD 2,165,000 (Package – 2) |
|
Owner: |
Oil Sector Services Company (OSSC) |
|
Construction Manager: |
Kuwait United Construction Management (KUCM) |
|
Consultant: |
Al Jazeera Consultant (JC) |
|
Contractor: |
First Kuwaiti trading & and contracting (FKTC) |
|
Start Date: |
28 – Apr -2012 |
55 |
Hawally Immigration Dept. Building, Kuwait |
|
||
Description: |
the construction, completion, commissioning, handover and maintenance of Hawali Immigration Department Building with an
approximately plot area 5000 m2 |
|
||
Project: |
KD 3,198,000.000 |
|||
Owner: |
Ministry Of Interior |
Contact: |
E. Ahmed Hussain |
|
Consultant: |
Taher Consultant Engineering Center |
Contact: |
E. Wael Ali |
|
Contractor: |
Alargan International Real Estate Co. |
Contact: |
E. Khaled Aloosh |
|
Start Date: |
28 – Jun -2012 |
Finish: |
19 – Dec – 2013 |
|
Duties: |
Target CPM, progress reports & follow up , claim guarding |
56 |
Al-Asemah Educational Headquarters’ Building- (High raise project), Kuwait |
|
||
Description: |
he construction of Educational Offices Headquarters’ Building located at sharq district with approximately site layout area 5500 m2. the main building (2basement+ground+2mizz+14typical
levels) and landscape works |
|
||
Project: |
KD 3,940,555.000 |
|||
Owner: |
MPW, Ministry Of Public Work |
Contact: |
E. Ali Naddoum E. Galal Mostafwe |
|
Consultant: |
MPW, Ministry Of Public Work |
Contact: |
|
|
Contractor: |
Al-Tawbad Contracting Co. |
Contact: |
E. Emad Abdul Ghafar |
|
Start Date: |
01 – Apr -2013 |
Finish: |
|
|
Duties: |
Target CPM, progress reports & follow up, resources Control (shutter& crew
movement), claim guarding |
57 |
Police head quarter Farwaniya (horizontal project), Kuwait |
|
||
Description: |
The construction of police head quarter Farwaniya located in ardiya district with approximately site layout area 20,000 m² |
|
||
Project: |
KD 11,654,088.610 |
|||
Owner: |
MPW, Ministry Of Public Work |
Contact: |
E. Shimaa |
|
Consultant: |
SSHI |
Contact: |
E. Ashraf khatab |
|
Contractor: |
Kuwait Building House Co. |
Contact: |
E. Ahmed Ali |
|
Start Date: |
10 – Jul -2013 |
Finish: |
09 – Jul -2015 |
|
Duties: |
Target CPM, Update, progress reports & follow up , Site
meeting |
58 |
Car parking for permanent head quarter of manpower & government restructuring program (CPA/269), Kuwait |
|
||
Description: |
The construction of car parking located in Rigae with approximately site layout area 8295 m² |
|
||
Project: |
KD 5,700,000.000 |
|||
Owner: |
MPW, Ministry Of Public Work Researches |
Contact: |
E. Saleh El-Azmy |
|
Consultant: |
MPW, Ministry Of Public Work Researches |
Contact: |
E. Saleh El-Azmy |
|
Contractor: |
United Victory Co. |
Contact: |
E. Adel Abdul Fattah |
|
Start Date: |
11 – Jan -2015 |
Finish: |
09 – Jan -2017 |
|
Duties: |
Target CPM, Update, progress reports & follow up , Site
meeting |
59 |
Sheikha Salwa Al-Sabah Centre for Stem cells and umbilical cord,
Kuwait |
|
||
Description: |
Construction, Completion and Maintenance of Sheikha Salwa Al-sabah Centre for Stem Cell and Umbilical Cord |
|
||
Project: |
KD 5,653,500.000 |
|||
Owner: |
Masharee Al-Khair Charity Co. |
Contact: |
|
|
Consultant: |
Dar SSH International |
Contact: |
|
|
Contractor: |
United Building Co. |
Contact: |
|
|
Start Date: |
15 – Mar -2016 |
Finish: |
15 – Sep -2017 |
|
Duties: |
Target CPM, progress reports & follow up , Resources
Control, claim guarding |
60 |
Wafra Housing Complex-02 Al Jabriya, Kuwait |
|
||
Description: |
New Housing Complex (3 Towers, Parking, Pool, Squash courts, Kindergarten, Gym, Restaurant), with approximately site area
6500 m² |
|
||
Project: |
KD 19,450,000 |
|||
Owner: |
Wafra Real Estate Co. |
Contact: |
|
|
Consultant: |
AGI/KEO |
Contact: |
|
|
Contractor: |
First United Co. |
Contact: |
E. Amer Dandachli |
|
Start Date: |
03 – Oct -2016 |
Finish: |
29 – Jun -2019 |
|
Duties: |
BIM Model (3D, 4D, 5D Model) LOD 500 |
61. Hind
Al-Mubarak Tower in Salmiya district:
-
Owner
representative
-
Nables
CO. to Privet sector
-
Through
FEB03 for 18 months
-
Project
value 4,000,000 KD
62. Construction
of 6 gardens in different districts in Kuwait
-
Project
Manager – Planning - PCS reports - Claims
-
For
Green line Co. To PAAF
-
Through
Jun05 for 24 months
-
Project
value 5,000,000 KD
63. Construction
of 15 foot bridges in Kuwait
Planning - PCS reports - Claims
For AL-Kharafi CO.
To MPW
Through Jun05 into for 24 months
Project value 2,000,000KD
64. Pre-grinder
in Kuwait Cement CO.
Planning - PCS reports - Claims
For KCC, AL Kharafi
co. to Kuwait Cement co
Through jun05 for
12 months
Project value
3,000,000 KD
65. KGL
Expeditors Warehouse Facility at Shuwaikh
Structural Shop Dwg. and supervision Architectural Shop
Dwg.
For Kuwait British Co to KGL co. – KUD
Through Apr05 for 12months
Project value 4,500,000 KD
66. New
plants Exhibition Building
CM for Design Phase and Licenses
For Papco CO. at ALRAI
Through Mar05 for 8
months
Project value 2,500,000 KD
67. Collage
of Engineering and Petroleum (KH14)
Planning - PCS reports - Claims
For Al Kharafi CO.
To KUCP
Through Dec05 for 18 months
Project value 1,500,000 KD
68.
College
of Science Cafeteria (KH30)
Planning - PCS reports - Claims
For KAK To KUCP - MAC consultant
Through jul06 for 18 months
Project value 1,000,000 KD
69.
Military
missile station at( Sabhan ) 6 buildings
- 40,000 m2 landscape)
Structure Shop drawing
For Al-Jawad CO. to
MOD
Through Jan05 for 12 months
Project value 2,500,000 KD
70. Construction
of Transmission lines and 7 reservoirs for WAFRA farms (for B3 Project):
Planning - PCS reports - Claims
For Green line co. To MPW
Through nov05 for 24 months
Project value 3,000,000 KD
71. Construction
of Services facility project in (Bagdad green area) D16
Planning - PCS reports
Special High Planning
For Gulf Catering CO. (GCC) to American army
Through may06 for 6 months
Project value 15,000,000 KD
72.
Construction
of Services facility project in (Bagdad green area) C5.2
Planning - PCS reports
Special High Planning
For Gulf Catering CO. (GCC) to American army
Through may06 for 6 months
Project value 15,000,000 KD
73.
Construction
of Services facility project in (Bagdad green area) C5.3
Planning - PCS reports
Special High Planning
For Gulf Catering CO. (GCC) to American army
Through may06 for 6 months
Project value 15,000,000 KD
74. Construction
of Services facility project in (Bagdad green area) C1.2
Planning - PCS reports
Special High Planning
for project
requirements control
For Gulf Catering CO. (GCC) to American army
Through may06 for 6 months
Project value 15,000,000 KD
75.
Motlaa
Border administration building
Planning - PCS reports
For Al-Adwani co. to MOI
Through may06 for 12 months
Project value 2,000,000 KD
76. Al-Salam Neighborhood center
Planning - PCS reports - Claims
For Al Omara co. To MPW
From Jul06 for 24 months
Project value 7,000,000 KD
77. DANA TOWER @ GULF street
Shop drawing Services
For KMC To privet sector owner
From Dec06 for 18 months
Project value 3,500,000 KD
78. 6 Residential blg’s at hawalli district
Planning - PCS
reports
For integrated co to privet sector owner
From SEP07 for 12
months
Project value 5,000,000 KD
79.
KOC, Taameer Annex building
Planning - PCS reports
Shop Drawings
For Al OMARA co. to KOC
Through dec07 for 12 months
Project value 1,000,000 KD
80. SURRA
COOPERATIVE SOCIETY
Planning - PCS reports
For AL OMARA CO To cooperative society
Through Aug08 for 30 months
Project value 3,700,000 KD
81. Renovation of Sultan Center Shuwaiykh
Planning - PCS reports - Claims
Kharafi CO. To
Sultan Center
Through Aug08 for 12 months
Project value 1,500,000 KD
82. RASHEED SCHOOL
Planning - PCS reports – Claims
Prepare a dispute
Burgan CO. To
MPW
Through oct08 for 18 months
Project value 1,550,000 KD
83. KISR New Technical workshop Building
Planning - PCS reports - Claims
Al SANEA CO. To
KISR
Through jan09 for 18 months
Project value 1,500,000 KD
84. American University Middle East
Planning - PCS reports - Claims
First CO. To AUM
through jan09 for 18 months
Project value 5,000,000 KD
85. Secondary school at south Surra District
Claims
Ghanim Abd Allah Al Othman CO. To MPW
Through Aug09 Project value 3,500,000 KD
86. National guard (telecom center building)
Planning - PCS reports - Claims
Al FLIJ CO. To
National guard
through sep10 for 22 months
Project value 2,550,000 KD
87.
Water Researches Building
Planning - Target
Al FLIJ CO. To
KISR
through Jan11 for 24 months
Project value 3,500,000 KD
88.
ZENA MALL @ SHUWAIKH
Planning - PCS reports - Claims
All Packages’ To
PRIVET SECTOR
through JAN11 for 6 months
Project value 2,000,000 KD
89. Farwaniya School
Planning - PCS reports - Claims
Badr Al Mulla CO.
To MPW
through Jan10 for 24Months
Project value 5,000,000 KD
90. Infra –Roads – Boundary for PAAF
Planning - PCS reports - Claims
Abdul Hameed Al Isa CO.
To PAAF
Through Apr10 for 18 months
Project value 3,700,000 KD
91. Al Wasabi at Layalina Restaurant
Planning - PCS reports - Claims
Forum Interiors Co. W.L.L.
To GOOD FOOD CO.
Through Mar12 for 4
months
Project value 138000.000 KD
92. Kuwait Bowling Sports Club
Planning - PCS reports
Clint: Saleh Alqallaf Eng. Consultants Office.
Owner: PAYS
Period: Through Jul 2012 for July 2013
Project value: 12,150,000.000 KWD
93. Expansion of Farwaniya Hospital (Design Phase)
Planning - PCS reports
Clint: Saleh Alqallaf Eng. Consultants Office.
Owner: MOH
Project value: 2,250,000.000 KWD
94. SHUWEIKH LIQUID GAS FACTORY (Design Phase)
Planning - PCS reports
Clint: Saleh Alqallaf Eng. Consultants Office.
Owner: KOTC
Project value: 3,500,000.000 KWD
95. Al-Rabia Administrative Building (Design
Phase)
Planning - PCS reports
Clint: Saleh Alqallaf Eng. Consultants Office.
Owner: PAAF
96.
SHAIBA
Administrative Building (Design Phase)
Planning - PCS reports
Clint: Saleh Alqallaf Eng. Consultants Office.
Owner: KOTC
97.
Ayoub Office Tower – Sawaber
Planning - PCS reports
Clint: Saleh Alqallaf Eng. Consultants Office.
Owner: Al-Tamathul Real Estate Co.
Period: Through Oct 2012 to July 2013
Project value: 2,765,000.000 KWD
98. CONSTRUCTION OF BID PACK 5A&5B - ROADS,
SITE UTILITIES
Planning - PCS reports - Claims
Clint: Sino Hydro Co.
Owner: Kuwait University
Period: Through July 2013
Project value: 97,999,973.791 KWD
99. CONSTRUCTION OF SEM CELLS HOSPITAL
Planning – PCS
Clint: United Building Co. “UBC”
Owner: MOH
Period: Through 2017-2018
Project value: 6,000,000.000 KWD
100. CONSTRUCTION OF FARWANIYA POLICE HEAD QUARTER
Planning – PCS - CLAIM
Clint: Kuwait Building House Co. “KBH”
Owner: MPW
Period: Through 2016-2017
Project value: 6,000,000.000 KWD
101.
CONSTRUCTION OF MANPOWER HEAD QUARTER CAR
PARK- REGEEY
Planning – PCS - CLAIM
Clint: AL Fooz Co.
Owner: MPW
Period: Through 2016-2017
Project value: 6,000,000.000 KWD
102.
CONSTRUCTION
OF MUBARAK AL KABEER GOVERNORATE BUILDING
CLAIM
Clint: AL Fooz Co.
Owner: MPW
Period: Through 2016-2017
Project value: 6,000,000.000 KWD
103. CONSTRUCTION OF LIGHT WEAPON FACTORY
Planning
Clint: Mega-Tech Co
Owner: MOD
Period: Through 2017-2019
Project value: 30,000,000.000 KWD
104. CONSTRUCTION OF 9 FUEL STATIONS
Planning
Clint: Khalid Ali AL Kharafi Co
Owner: KNPC
Period: Through 2018-2019
Project value: 14,000,000.000 KWD
105. CONSTRUCTION AL TAHRIR CAMP CAR PARK
Planning
Clint: HOT & HDC CO
Owner: KNG
Period: Through 2016-2017
Project value: 6,000,000.000 KWD
E. Sameh Ibrahim Delivered Courses
- مبادئ اعداد البرنامج الزمني بالبريمافيرا ------ Primavera P6 beginner
- اساسيات وقواعد مطالبات عقود التشييد ------ Construction Claims Basics
- اعداد مهندس برامج زمنية محترف ------ Workshop Professional planner Primavera P6
- اعداد مهندس مطالبات عقود التشييد المحترف ------ Professional Claim Engineer
- اعداد مهندس خبير قضايا عقود التشييد ------ Professional Construction Cases Expert Engineer
- عقود الفيديك ------ FIDIC Contracts
- عقود الامتياز ------ BOT Contracts
- اعداد مهندس العقود المحترف ------ Contract Administration Engineer
- الهندسة القيمية ------ Value Engineering
- التحكيم الهندسي ------ Engineering Arbitration
- قانون المناقصات ------ Tender Law
- أحكام عقد المقاولة بالقانون المدني ------ Provisions of Construction Contract in Law
- كيفية تعامل مهندس المالك مع المقاول و الاستشاري ------ How Owner Engineer Control Contractor & Consultant
- التقييم الفني للمكاتب الاستشاريه و شركات المقاولات ------ Consultants & Contractors Evaluation
- مشروعات البنية التحتيه ------ Infra-structure projects
- تكنولوجيا تدوير المخلفات المدنيه و الصناعيه ------ Technology of recycling of residential and industrial waste
- اعداد التقارير الهندسيه بالمشاريع ------ Prepare of Project Reports
- تاهيل مهندس المالك ------ Qualification of Owner Engineer
- تاهيل مهندس الموقع ------ Qualification of Site Engineer
- كيف تكون مديرا ناجحا للمشروع ------ How to be Successful Project Manager
- تأهيل المهندس الاستشاري ------ Qualification of consultant Engineer
- ادارة صيانه المباني و الانشاءات ------ Management of construction Maintenance
- التحكم في تكاليف المشروع ------ Project Cost Control
- انظمه التحكم بالمشاريع ------ Project Control Systems
- الاعداد لاختبار مدير المشروع المحترف ------ PMP
- برنامج الاوتوكاد ------ Auto-CAD
- برنامج الريفيت المعماري ------ Revit Architectural
- برنامج الريفيت الانشائي ------ Revit Structural
- برنامج الريفيت الميكانيكا و الكهرباء ------ MEP Revit
- Naviswork
- اعداد المخططات الانشائيه التنفيذيه ------ Structural Shop drawings
- اعداد المخططات المعماريه التنفيذيه ------ Architectural Shop drawings
- اعداد المخططات التنسيقيه ------ Composite service drawings
- ادارة التحكم في مستندات المشروع ------ Project Document Control
- استخدام برنامج البريمافيرا في التحكم في مستندات المشروع ------ Project Document control By Primavera
- ادارة و تفعيل الاجتماعات الموقعيه ------ Prepare, manage and functionize the site meeting
- اغلاق المشاريع الهندسيه ------ Project Close-out
- ادارة الازمات في المشاريع المتعثرة ------ Crises Management in the delayed Projec